Loading pricing data from BigQuery...
Brown Haven Homes

ON-SITE QUOTE BUILDER

Client Information

Loading regions...

Grading Trip 1 - Site Preparation

Description30% Markup ActiveQtyCostTotalTotal after Markup
Intial Lot clearing
$0.00$0.00
Debris Removal
Load
$0.00$0.00
Demo/Removal
$0.00$0.00
Dirt Export
Yd
$0.00$0.00
Foundation Grading
$0.00$0.00
Entrance Gravel
Ton
$0.00$0.00
Driveway Gravel
Ton
$0.00$0.00
Driveway Pipe
Ea
$0.00$0.00
Silt Fence type A
$0.00$0.00
Silt Fence type C
Ln. Ft.
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Grading Trip 2 - Backfill & Utilities

Description30% Markup ActiveQtyCostTotalTotal after Markup
Backfill Grading
$0.00$0.00
Fill Dirt
Yd
$0.00$0.00
Gravel for Subwall
Ton
$0.00$0.00
Gravel for Garage Slab
Ton
$0.00$0.00
Trench Roller
$0.00$0.00
Matting
$0.00$0.00
1st Seed/Hay
Bale
$0.00$0.00
Touch Up Gravel
Ton
$0.00$0.00
Power by Grader
$0.00$0.00
Water line by Grader
$0.00$0.00
Fiber/cable
Ln. Ft.
$0.00$0.00
Gas Line
$0.00$0.00
Sewer Line
$0.00$0.00
Septic
$0.00$0.00
Pump? Yes/No
$0.00$0.00
Type
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Grading Trip 3 - Final Grading

Description30% Markup ActiveQtyCostTotalTotal after Markup
Final Grading
$0.00$0.00
Bury Propane Tank
Each
$0.00$0.00
Bury Propane Line
Ln. Ft.
$0.00$0.00
Final driveway gravel
Ton
$0.00$0.00
Gravel for walkout terrace
Ton
$0.00$0.00
Septic H/UP by grader
Each
$0.00$0.00
Top Soil
Yd
$0.00$0.00
2nd Seed and Hay
Bales
$0.00$0.00
Gutter Drains
Each
$0.00$0.00
Box Drain
Each
$0.00$0.00
Box drain pipe
$0.00$0.00
Gravel to front door
Ton
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Foundation - Walls Below Garage

Description30% Markup ActiveQtyCostTotalTotal after Markup
2' or below
$0.00$0.00
3'
$0.00$0.00
4'
$0.00$0.00
5'
$0.00$0.00
6'
$0.00$0.00
7'
$0.00$0.00
8'
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Foundation - Retaining Walls

Description30% Markup ActiveQtyCostTotalTotal after Markup
2' or below
$0.00$0.00
3'
$0.00$0.00
4'
$0.00$0.00
5'
$0.00$0.00
6'
$0.00$0.00
7'
$0.00$0.00
8'
$0.00$0.00
Retaining wall engineering
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Foundation - Subwalls

Description30% Markup ActiveQtyCostTotalTotal after Markup
2' or below
$0.00$0.00
3'
$0.00$0.00
4'
$0.00$0.00
5'
$0.00$0.00
6'
$0.00$0.00
7'
$0.00$0.00
8'
$0.00$0.00
Subwall wall engineering
$0.00$0.00
Subwall rebar matting (PER SF)
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Foundation - Brick Ledge

Description30% Markup ActiveQtyCostTotalTotal after Markup
Front
$0.00$0.00
Left side
$0.00$0.00
Right side
$0.00$0.00
Rear
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Porches/Decks

Description30% Markup ActiveQtyCostTotalTotal after Markup
12' 6x6 deck posts
$0.00$0.00
14' 6x6 deck posts
$0.00$0.00
Post Piers 4' block
$0.00$0.00
Additional Steps
$0.00$0.00
4X4 Stairs Landings
$0.00$0.00
4X8 Stairs Landings
$0.00$0.00
Step off pads
$0.00$0.00
Open Deck
$0.00$0.00
Slab/Adder
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Pony Walls

Description30% Markup ActiveQtyCostTotalTotal after Markup
2'
$0.00$0.00
4'
$0.00$0.00
6'
$0.00$0.00
8'
$0.00$0.00
10'
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Block Work

Description30% Markup ActiveQtyCostTotalTotal after Markup
12" Block
$0.00$0.00
8" Block
$0.00$0.00
Step Downs
$0.00$0.00
Fill Cells
$0.00$0.00
Sticks of rebar
$0.00$0.00
Block wall engineering
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Special Conditions

Description30% Markup ActiveQtyCostTotalTotal after Markup
Power by Provider
$0.00$0.00
Generator
$0.00$0.00
Extra Surveying
$0.00$0.00
Engineering
$0.00$0.00
Soil Testing
$0.00$0.00
Helical or Augered Piers
$0.00$0.00
Material delivery issues
$0.00$0.00
Stick Frame roof
$0.00$0.00
Temp. water
$0.00$0.00
Booster pumps for water
$0.00$0.00
Hard Surface driveway
$0.00$0.00
Sidewalks
$0.00$0.00
Maintain Road
$0.00$0.00
Lawn Maintenance
$0.00$0.00
Full Size Crawlspace door
$0.00$0.00
Low boy water heater
$0.00$0.00
HVAC platform
$0.00$0.00
Fill Garage cells
$0.00$0.00
Increased Turndowns
$0.00$0.00
Stucco on exposed foundation
$0.00$0.00
Cultured stone on exp. Foundation
$0.00$0.00
Brick on exposed foundation
$0.00$0.00
Natural Stone on exposed foundation
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Allowance

Displayed to customer (optional)

Description30% Markup ActiveQtyCostTotalTotal after Markup
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00

Additional POs

Section Subtotal: $0.00
Total Markup: $0.00

Summary

$
$
Subtotal (All Items):$0.00
Markup:+$0.00

Preferences

Choose how the presentation groups totals for your customer.

Grand Total:$0.00

* Estimate Expires 30 Days After the Quote Date

** Your New Home Specialist will present your final Site Investment Numbers once they are confirmed.